久久久久亚洲AV成人无码-国产美女久久精品香蕉69-国产综合久久久久久鬼色-久久这里只有精品18-亚洲女久久久噜噜噜熟女

公司新聞

當(dāng)前位置:首頁(yè) > 新聞中心 > 公司新聞

自動(dòng)排水器的安裝步驟你需要了解一下!

來(lái)源:http://m.xingchangweb.com/   日期:2021-01-28   瀏覽量:0
TAG:山東制氮機(jī),山東干燥機(jī),山東螺桿鼓風(fēng)機(jī),山東空壓機(jī),山東自動(dòng)排水器

相信大家都見(jiàn)過(guò)自動(dòng)排水器在我們生活周邊的應(yīng)用,自動(dòng)排水器用于自動(dòng)排除管道低處、油水分離器、氣罐及各種過(guò)濾器底部等處的冷凝水。可安裝于不便進(jìn)行人工排污水的地方,如高處、低處、狹窄處。并可避免人工排水被遺忘而造成壓縮空氣被冷凝水重新污染。接下來(lái)讓我們一起學(xué)習(xí)一下關(guān)于山東自動(dòng)排水器的安裝步驟。希望能夠幫助到有這方面需求的朋友們!

I believe you have seen the application of automatic drainer in our living surroundings. Automatic drainer is used to automatically drain the condensate water at the bottom of pipes, oil-water separators, gas tanks and various filters. It can be installed in places where it is inconvenient to discharge sewage manually, such as high, low and narrow places. And it can avoid the artificial drainage being forgotten and causing the compressed air to be re polluted by the condensed water. Next, let's learn about the installation steps of automatic drainer. Hope to be able to help friends with this demand!

一:在你開(kāi)始安裝之前應(yīng)該要做的事是把清潔壓縮空氣系統(tǒng)里打掃干凈,這一步做好了對(duì)于我們后面的安裝有很大的幫助。

1: Before you start the installation, what you should do is to clean the compressed air system. This step is very helpful for our later installation.

f4596ac69b4c9c8d5e60b00fb05256d.jpg

二:在你安裝的時(shí)候應(yīng)該注意機(jī)器上閥體上面箭頭的具體指向,還有出水口千萬(wàn)不要用不抗氣流沖擊的軟管來(lái)連接,不讓你當(dāng)你安裝完成開(kāi)始使用一段時(shí)間以后你就會(huì)發(fā)現(xiàn)你的水排不出去了,此時(shí)應(yīng)該就是這個(gè)軟管脫離了。

2: When you install, you should pay attention to the specific direction of the arrow on the valve body of the machine, and the water outlet. Do not use the hose that is not resistant to the impact of air flow to connect it. When you finish the installation and start to use it for a period of time, you will find that your water can not be discharged. At this time, the hose should be separated.

三:注意你接入自動(dòng)排水器的電壓大小應(yīng)該與自動(dòng)排水器上的額定電壓一樣,大概也行,但是不能太低也不能高于,多就是小于等于了。而且如果你使用直流電的話,那你接入的正極必須得與自動(dòng)排水器上的接頭“1”連接。

3: Note that the voltage you connect to the automatic drainer should be the same as the rated voltage on the automatic drainer, probably OK, but not too low or higher, at most less than or equal to. And if you use direct current, the positive pole you connect must be connected to the connector "1" on the automatic drainer.

四:如果是出廠的時(shí)候就已經(jīng)接好的排水閥門的話,那我們我們就應(yīng)該要明白的是此時(shí)自動(dòng)排水器上的褐色導(dǎo)線為火線L,藍(lán)色導(dǎo)線為零線N,黃綠雙色的是需要我們完成安裝后連接的地線GND。

4: If the drain valve has been connected before leaving the factory, what we should understand is that the brown wire on the automatic drain device is the live wire L, the blue wire is the zero wire n, and the yellow and green wire is the ground wire GND that we need to connect after installation.

五:為了避免接線盒上的長(zhǎng)螺釘進(jìn)水燒毀,我們必須得把長(zhǎng)螺釘好好擰緊。這里給點(diǎn)自動(dòng)排水器安裝小提示,安裝前電源必須為斷開(kāi)狀態(tài),還有就是壓縮空氣得保證完全排空即此時(shí)自動(dòng)排水器中屬于零壓力狀態(tài)下。

5: In order to prevent the long screws on the junction box from being burnt out by water, we must tighten them well. Here are some tips for the installation of automatic drainer. Before the installation, the power supply must be disconnected, and the compressed air must be fully drained, that is, the automatic drainer is in the zero pressure state.

其實(shí)它的安裝方法并不是特別難,主要在于安裝之前了解關(guān)于安裝它的一些常識(shí)就好,知道了這些小常識(shí)后我相信自動(dòng)排水器的安裝已不再是那么的難了,不過(guò)鑒于以及使用壽命的問(wèn)題,。

In fact, its installation method is not particularly difficult. The main thing is to know some common sense about installing it before installation. After knowing these common sense, I believe that the installation of automatic drainer is no longer so difficult, but in view of the safety and service life problems,.


上一篇:空壓機(jī)對(duì)于激光切割機(jī)的重要性
下一篇:空壓機(jī)油分爆炸的原因有哪些?

久久久久亚洲AV成人无码-国产美女久久精品香蕉69-国产综合久久久久久鬼色-久久这里只有精品18-亚洲女久久久噜噜噜熟女