久久久久亚洲AV成人无码-国产美女久久精品香蕉69-国产综合久久久久久鬼色-久久这里只有精品18-亚洲女久久久噜噜噜熟女

公司新聞

當(dāng)前位置:首頁 > 新聞中心 > 公司新聞

空壓機(jī)維修中縮短檢修時(shí)間的技術(shù)方法

來源:http://m.xingchangweb.com/   日期:2021-01-08   瀏覽量:0
TAG:山東制氮機(jī),山東干燥機(jī),山東螺桿鼓風(fēng)機(jī),山東空壓機(jī),山東自動(dòng)排水器

我們?cè)诳諌簷C(jī)的使用中,隨著時(shí)間的推移,空壓機(jī)都會(huì)出現(xiàn)一些故障,那么在空壓機(jī)維修中有沒有快讀檢修的方法呢?今天就給您介紹幾個(gè):

We in the use of air compressor, as time goes on, air compressor will appear some faults, so in the air compressor maintenance there is no quick read maintenance method? Today, I'd like to introduce some of them to you

一、應(yīng)用網(wǎng)絡(luò)技術(shù)安排修理計(jì)劃,找出關(guān)鍵路線,并加以調(diào)整優(yōu)化

1、 Apply network technology to arrange repair plan, find out the key route, and adjust and optimize it

網(wǎng)絡(luò)技術(shù)又稱關(guān)鍵線路法,是一種計(jì)劃管理方法。它是通過分析項(xiàng)目過程中哪個(gè)活動(dòng)序列進(jìn)度安排的總時(shí)差少來預(yù)測(cè)項(xiàng)目工期。它用網(wǎng)絡(luò)圖表示各項(xiàng)工作之間的相互關(guān)系,找出控制工期的關(guān)鍵路線,以達(dá)到縮短工期、提供工效、降低成本的目的。

20210108538993.jpg

Network technology, also known as critical path method, is a plan management method. It predicts the project duration by analyzing which activity sequence has the least total time difference. In order to shorten the construction period, provide work efficiency and reduce the cost, the network diagram is used to show the relationship between various works and find out the key route to control the construction period.

山東空壓機(jī)

二、采用同步修理法

2、 Adopt synchronous repair method

將設(shè)備中易損件的使用壽命設(shè)備成按近,做到同次修理、同次更換。將生產(chǎn)過程中工藝上相互聯(lián)系的若干臺(tái)設(shè)備,安排在統(tǒng)一時(shí)間修理。

The service life of the vulnerable parts in the equipment should be close to that of the equipment, so that they can be repaired and replaced at the same time. Several equipments which are related to each other in the production process are arranged to be repaired at the same time.

三、采用分步修理法

3、 Step by step repair method is adopted

有計(jì)劃地分幾次修理設(shè)備各相對(duì)獨(dú)立部分,每次只修一部分、可利用節(jié)假日進(jìn)行修理。

The equipment can be repaired several times in a planned way, and each part is relatively independent. Only one part of the equipment can be repaired each time.

四、采用冗余技術(shù),包括采用備機(jī)、備用部件替換修理法

4、 Redundancy technology is adopted, including replacement and repair of spare machine and spare parts

這種方法又稱儲(chǔ)備技術(shù),有時(shí)也稱容災(zāi)備份技術(shù),它是利用系統(tǒng)的并聯(lián)模型來提高系統(tǒng)可靠性的一種手段。

This method is also called reserve technology, sometimes called disaster recovery and backup technology. It is a means to improve the reliability of the system by using the parallel model of the system.

五、采用無維修設(shè)計(jì)或易維修設(shè)計(jì)

5、 Adopt no maintenance design or easy maintenance design

無維修設(shè)計(jì)是一種理想設(shè)計(jì),即考慮維修達(dá)到“無停機(jī)時(shí)間”、“無維修費(fèi)用”的可能性,以設(shè)計(jì)出不需要維修的設(shè)備。它要求從設(shè)計(jì)開始就要造成設(shè)備維修的原因,對(duì)于維修費(fèi)用很高的設(shè)備尤為適用。

Maintenance free design is an ideal design, that is, considering the possibility of maintenance to achieve "no downtime" and "no maintenance cost", to design equipment that does not need maintenance. It requires that the causes of equipment maintenance should be eliminated from the beginning of design, especially for equipment with high maintenance cost.


上一篇:影響干燥機(jī)效果的因素及設(shè)備特點(diǎn)
下一篇:空壓機(jī)調(diào)節(jié)閥出現(xiàn)的幾種故障及解決方式

久久久久亚洲AV成人无码-国产美女久久精品香蕉69-国产综合久久久久久鬼色-久久这里只有精品18-亚洲女久久久噜噜噜熟女