久久久久亚洲AV成人无码-国产美女久久精品香蕉69-国产综合久久久久久鬼色-久久这里只有精品18-亚洲女久久久噜噜噜熟女

行業(yè)新聞

當(dāng)前位置:首頁 > 新聞中心 > 行業(yè)新聞

自動排水器的安裝步驟 你了解多少呢?

來源:http://m.xingchangweb.com/   日期:2020-12-09   瀏覽量:0
TAG:山東制氮機(jī),山東干燥機(jī),山東螺桿鼓風(fēng)機(jī),山東空壓機(jī),山東自動排水器

自動排水器用于自動排除管道低處、油水分離器、氣罐及各種過濾器底部等處的冷凝水??砂惭b于不便進(jìn)行人工排污水的地方,如高處、低處、狹窄處。并可防止人工排水被遺忘而造成壓縮空氣被冷凝水重新污染。

The automatic drainer is used to automatically drain the condensed water at the lower part of the pipeline, the oil-water separator, the air tank and the bottom of various filters. It can be installed in places where it is inconvenient to manually discharge sewage, such as high place, low place and narrow place. It can also prevent the artificial drainage from being forgotten and causing the compressed air to be re polluted by condensate water.

自動排水器安裝步驟

Installation steps of automatic drainer

1:在你開始安裝之前應(yīng)該要做的事是把清潔壓縮空氣系統(tǒng)里打掃干凈,這一步做好了對于我們后面的安裝有很大的幫助。

1: Before you start the installation, you should do is to clean the compressed air system. This step is very helpful for our later installation.

20201209667148.jpg

2:在你安裝的時候應(yīng)該注意機(jī)器上閥體上面箭頭的具體指向,還有出水口千萬不要用不抗氣流沖擊的軟管來連接,不讓你當(dāng)你安裝完成開始使用一段時間以后你就會發(fā)現(xiàn)你的水排不出去了,此時應(yīng)該就是這個軟管脫離了。

2: When you install, you should pay attention to the specific direction of the arrow on the valve body of the machine, as well as the water outlet. Do not use the hose that is not resistant to air impact to connect. When you install and start to use for a period of time, you will find that your water can not be drained out. At this time, it should be that the hose is detached.

3:注意你接入自動排水器的電壓大小應(yīng)該與自動排水器上的額定電壓一樣,大概也行,但是不能太低也不能高于,就是小于等于了。而且如果你使用直流電的話,那你接入的正極必須得與自動排水器上的接頭“1”連接。

3: Note that the voltage you connect to the automatic drainer should be the same as the rated voltage on the automatic drainer. It is probably OK, but it cannot be too low or higher, that is, it is less than or equal to. And if you use direct current, the positive pole you connect to must be connected to the connector "1" on the automatic drainer.

4:如果是出廠的時候就已經(jīng)接好的排水閥門的話,那我們我們就應(yīng)該要明白的是此時自動排水器上的褐色導(dǎo)線為火線L,藍(lán)色導(dǎo)線為零線N,黃綠雙色的是需要我們完成安裝后連接的地線GND。

4: If it is a drain valve that has been connected when leaving the factory, we should understand that the brown wire on the automatic drainer is the live wire L, the blue wire is the zero wire n, and the yellow and green color is the GND ground wire that needs to be connected after the installation.

5:為了防止接線盒上的長螺釘進(jìn)水燒毀,我們必須得把長螺釘好好擰緊。這里給點自動排水器安裝小提示,安裝前電源必須為斷開狀態(tài),還有就是壓縮空氣得保證完全排空即此時自動排水器中屬于零壓力狀態(tài)下。

5: In order to prevent the long screw on the junction box from being burned by water, we must tighten the long screw well. Here are some tips for the installation of the automatic drainer. Before installation, the power supply must be disconnected, and the compressed air must be completely drained, that is, the automatic drainer belongs to zero pressure state at this time.

其實它的安裝方法并不是特別難,主要在于安裝之前了解關(guān)于安裝它的一些常識就好,知道了這些小常識后我相信自動排水器的安裝已不再是那么的難了,不過鑒于以及使用壽命的問題,小編還是比較覺得找個老師或者自動排水器安裝公司來給你全程安裝處理要好一點,這樣不僅問題得到了解決,重要的是有了安裝售后服務(wù)的我們以后再也不用擔(dān)心哪天自動排水器突然不排水了或者哪兒斷了出問題了,

In fact, its installation method is not particularly difficult. The main thing is to know some common sense about installing it before installation. After knowing these little common sense, I believe that the installation of automatic drainage device is no longer so difficult. However, in view of the safety and service life, the editor still thinks that a teacher or an automatic drainer installation company will provide you with the whole installation process Better, not only has the safety problem been solved, but also, with the installation of after-sales service, we don't have to worry about the day when the automatic drainer suddenly fails to drain or where it breaks,


上一篇:空壓機(jī)在冬季如何進(jìn)行保養(yǎng)?
下一篇:山東干燥機(jī)常見的清洗辦法有哪些?

久久久久亚洲AV成人无码-国产美女久久精品香蕉69-国产综合久久久久久鬼色-久久这里只有精品18-亚洲女久久久噜噜噜熟女