久久久久亚洲AV成人无码-国产美女久久精品香蕉69-国产综合久久久久久鬼色-久久这里只有精品18-亚洲女久久久噜噜噜熟女

公司新聞

當(dāng)前位置:首頁(yè) > 新聞中心 > 公司新聞

山東制氮機(jī)巧談:變壓吸附制氮裝置操作及注意事項(xiàng)

來(lái)源:http://m.xingchangweb.com/   日期:2020-11-18   瀏覽量:0
TAG:山東制氮機(jī),山東干燥機(jī),山東螺桿鼓風(fēng)機(jī),山東空壓機(jī),山東自動(dòng)排水器

變壓吸附制氮技術(shù)現(xiàn)在廣泛應(yīng)用于化工、電子、紡織、醫(yī)藥、食品等行業(yè)。根據(jù)變壓吸附原理,制氮機(jī)采用高品質(zhì)分子篩作吸附劑,在一定壓力下從空氣中分理出氮?dú)?。變壓吸附制氮機(jī)在實(shí)際操作中有一些重要的注意事項(xiàng):

Pressure swing adsorption technology is widely used in chemical industry, electronics, textile, medicine, food and other industries. According to the principle of pressure swing adsorption, high quality molecular sieve is used as adsorbent to separate nitrogen from air under certain pressure. There are some important points for attention in the actual operation of PSA nitrogen generator

變壓吸附制氮裝置操作及注意事項(xiàng)

Operation and precautions of PSA nitrogen plant

一、安裝要求

1、 Installation requirements

1、應(yīng)按設(shè)備實(shí)際尺寸選擇足夠大的場(chǎng)地。與周圍環(huán)境之間的距離保持1米以上,以利于操作及維護(hù)保養(yǎng)。

1. The site should be large enough according to the actual size of the equipment. Keep a distance of more than 1 meter from the surrounding environment to facilitate operation and maintenance.

2、安裝場(chǎng)地必須有良好的通風(fēng),少灰塵。

2. The installation site must have good ventilation and less dust.

3、 不能安裝于有腐蝕性的環(huán)境中。

3. Do not install in corrosive environment.

20201118295588.jpg

4、 消聲器(制氮裝置廢氣出口)既可裝在室內(nèi)也可裝在室外,空壓機(jī)與制氮裝置在同一房間時(shí),消聲器應(yīng)安裝在室外,以免影響氮?dú)猱a(chǎn)量。

4. Muffler (exhaust gas outlet of nitrogen generation device) can be installed indoor or outdoor. When air compressor and nitrogen generation device are in the same room, muffler should be installed outdoors to avoid affecting nitrogen output.

5、制氮裝置放在通風(fēng)不暢的地方,消聲器應(yīng)安裝在室外。

5. The nitrogen generating device should be placed in the place with poor ventilation, and the muffler should be installed outdoors.

6、消聲器如裝在室外,裝設(shè)在室外的消聲器應(yīng)有防雨設(shè)施,注意其放置高度不能高出廢氣出口,否則管路污水非但不能排出且易使污水倒灌。

6. If the muffler is installed outdoors, the muffler installed outdoors shall be equipped with rain proof facilities. Pay attention that the installation height shall not be higher than the exhaust gas outlet, otherwise, the sewage in the pipeline can not be discharged and the sewage will be easily poured back.

7、 電源安裝注意事項(xiàng):1.7.1 電源應(yīng)按標(biāo)定的電壓(V)、電流(A)、相數(shù)配置;

7. Precautions for power supply installation: 1.7.1 the power supply shall be configured according to the calibrated voltage (V), current (a) and phase number;

8、 電網(wǎng)電壓應(yīng)在交流±10%范圍內(nèi);

8. The grid voltage should be within ± 10% AC;

9、為了保證,電壓電器元件等必須有效接地;

9. In order to ensure safety, safe voltage electrical components must be effectively grounded;

10 、電器設(shè)備的安裝必須按有關(guān)規(guī)定和要求進(jìn)行。

10. The installation of electrical equipment must be carried out in accordance with the relevant national regulations and requirements.


上一篇:制氮機(jī)設(shè)備的安裝對(duì)場(chǎng)地的具體要求
下一篇:使空壓機(jī)的方式有哪些?

久久久久亚洲AV成人无码-国产美女久久精品香蕉69-国产综合久久久久久鬼色-久久这里只有精品18-亚洲女久久久噜噜噜熟女